Abstract
This document addresses requirements for design, construction and testing of high-pressure transfer systems for FSRU/ FRU/ FSU applications. High-pressure transfer systems are considered to be ship-to-shore systems transferring pressurized gas from floating units to any part of a gas grid.
General information
-
Status: DeletedStage: Project deleted [20.98]
-
Edition: 1
-
Technical Committee :ISO/TC 67/SC 9
- RSS updates