Reference number
IWA 33-3:2021
International Workshop Agreement
IWA 33-3:2021
Technical guidelines for the development of small hydropower plants — Part 3: Design principles and requirements
Edition 1
2021-03
International Workshop Agreement
Preview
IWA 33-3:2021
82192
недоступно на русском языке
Опубликовано (Версия 1, 2021)

IWA 33-3:2021

IWA 33-3:2021
82192
Язык
Формат
CHF 194
Пересчитать швейцарские франки (CHF) в ваша валюта

Тезис

This document specifies the general principles and basic requirements of design for small hydropower (SHP) projects up to 30 MWe, mainly including hydrology, geology, energy calculations, project layout, hydraulics, electromechanical equipment selection, construction planning, project cost estimates, economic appraisal, social and environmental assessments.

Application of this document is intended to be site specific, with the principles and requirements of design applied in accordance with the needs of proposed hydropower plant.

Общая информация

  •  : Опубликовано
     : 2021-03
    : Опубликование международного стандарта [60.60]
  •  : 1
  • ISO/TC 339
    27.140 
  • RSS обновления

Жизненный цикл

Появились вопросы?

Ознакомьтесь с FAQ