IWA 33-3:2021
p
IWA 33-3:2021
82192
Status : Published
en
Format Language
std 1 187 PDF + ePub
std 2 187 Paper
  • CHF187
Convert Swiss francs (CHF) to your currency

Abstract

This document specifies the general principles and basic requirements of design for small hydropower (SHP) projects up to 30 MWe, mainly including hydrology, geology, energy calculations, project layout, hydraulics, electromechanical equipment selection, construction planning, project cost estimates, economic appraisal, social and environmental assessments.

Application of this document is intended to be site specific, with the principles and requirements of design applied in accordance with the needs of proposed hydropower plant.

General information

  •  : Published
     : 2021-03
    : International Standard published [60.60]
  •  : 1
     : 80
  • ISO/TMBG
    27.140 
  • RSS updates

Read sample 

Preview this standard in our Online Browsing Plateform (OBP)

Got a question?

Check out our FAQs

Customer care
+41 22 749 08 88

Opening hours:
Monday to Friday - 09:00-12:00, 14:00-17:00 (UTC+1)